Kuala Lumpur, monorail unit Nr. parc 2101
Secondary photos (1): hide / show
Conditional photos (1): hide / show
Technical photos (0): hide / show
2024
2023
 |
Kuala Lumpur, Scomi SUTRA Nr. parc 2309 — Traseu 8, 2309+2310+2311+2312
Bukit Nanas — Medan Tuanku Traseu 8, 2101+2102+2103+2104
A meeting of trains with a monorail bridge over the Sungai Kelana River in the background.
• • •
Встреча поездов с мостом монорельса через реку Sungai Kelana на заднем плане.
19 aprilie 2023 an, Miercuri Autor: Ymtram
|
¤ |
 |
Medan Tuanku — Chow Kit Traseu 8, 2101+2102+2103+2104
The first of the 4-car 2nd generation trains, entered service in 2014.
• • •
Первый из 4-вагонных поездов 2-го поколения, введён в оборот с 2014 года.
19 aprilie 2023 an, Miercuri Autor: Ymtram
|
¤ |
2023
2021
 |
Kuala Lumpur, Malaysia Traseu 8
Scomi Sutra no.21 taken from Titiwangsa Station Terminus(Interchange with Sri Petaling-Ampang Line)
28 octombrie 2021 an, Joi Autor: Mirzgoat
|
¤ |
↑ 2014 an Arrived at the facility
Vă rugăm să nu aduceți în discuție subiecte politice, altfel veți fi suspendat pentru cel puțin o lună!
Trebuie să vă conectați pentru a scrie comentarii.
Vehicle lists:
|