TransPhotoLinnade elektritransport

Antwerpen, trammivagun № 7305

Linn:Antwerpen   Belgia
Asukoht:Antwerpen
Depoo/park:De Lijn
Mudel:Bombardier Flexity 2
Valmistatud:06.2015
Hetkeseis: Töökorras 
Otstarve:Liinisõiduk
43 meters

Teisejärgulised fotod (1): peida / näita
Tingimuslikud fotod (0): peida / näita
Tehnilised fotod (0): peida / näita

575 KB
22

Blancefloerlaan
Marsruut 15, P+R Boechout

31 august 2024 a., laupäev
Autor: AntwerpMetro

¤
601 KB
34

Antwerpen,  Bombardier Flexity 2  7360  —  Marsruut 3

Blancefloerlaan
Marsruut 15

31 august 2024 a., laupäev
Autor: AntwerpMetro

¤
583 KB
50

Grotesteenweg
Marsruut 15, P+R Boechout

14 mai 2024 a., teisipäev
Autor: AntwerpMetro

¤
636 KB
82

Koningin Astridplein
Marsruut 3, P+R Merksem

From February 10th to 13th there are a lot of works on the network. New tracks and power lines are installed at several locaties.
So lines 6 and 15 were not operated and on Sunday 11th a temporary line 16 was operated between P+R Melsele and P+R Olympiade. Line 3 run between P+R Merksem and Centraal Station

11 veebruar 2024 a., pühapäev
Autor: AntwerpMetro

¤
647 KB
62

Koningin Astridplein
Marsruut 3, Centraal Station

From February 10th to 13th there are a lot of works on the network. New tracks and power lines are installed at several locaties.
So lines 6 and 15 were not operated and on Sunday 11th a temporary line 16 was operated between P+R Melsele and P+R Olympiade. Line 3 run between P+R Merksem and Centraal Station

11 veebruar 2024 a., pühapäev
Autor: AntwerpMetro

¤
2024
2023
659 KB
145

Eindhalte (endstation) Regatta
Marsruut 3, P+R Merksem

5 september 2023 a., teisipäev
Autor: AntwerpMetro

¤
2023
2022
415 KB
153

Bredabaan
Marsruut 3

3 august 2022 a., kolmapäev
Autor: František Vaňásek

¤
514 KB
143

Minister Delbekelaan
Marsruut 3

Station: Merksem, Gasthuishoeve

2 august 2022 a., teisipäev
Autor: František Vaňásek

¤
2022
2020
458 KB
353

Bredabaan
Marsruut 2

Covid-19: No traffic to be seen on the picture. Some trams have been given a specific covering.

As a result of track works, line 2 was split into two parts. A part was operated from the Luchtbal depot, which resulted that the 43 m long trams being exceptionally used on this line. For the occasion, line 2 was diverted to the old terminus on the left bank.

8 mai 2020 a., reede
Autor: focus1965

¤

  29 juuni 2015 a.    Saabus ettevõttesse


Kommentaar

Poliitilise arutelu eest rakendub blokeerimine 1 kuuks
Teie ei ole saidile sisenenud.
Kommentaare võivad kirjutada ainult registreeritud kasutajad.

Veeremi nimekirjad: