Antwerpen, tramvaju vagons № 7243
Video ar transportlīdzekli:
Sekundārie attēli (0): noslēpt / parādīt
Conditional photos (0): noslēpt / parādīt
Technical photos (0): noslēpt / parādīt
 |
Koningin Astridplein Maršruts 4, Centraal Station
The tracks of the Antwerp network are in bad to very bad condition. Yesterday evening a track broke at Borsbeeksebrug. Due to that lines 4 and 9 have to drive an alternate route.
As of today line 4 is now Zwaantjes-Centraal Station (normal route is Zwaantjes-Berchem Station)
Line 9 is now Silsburg-Groenplaats via metro stations: Zegel-Astrid and Opera (normal route is Silsburg-P+R Linkeroever via metro stations: Plantin-Diamant-Opera-Meir and Groenplaats).
4 jūnija 2024 g., otrdiena Autors: AntwerpMetro
|
¤ |
2024
2023
 |
Vaartweg Ruggeveldlaan Maršruts 8, Astrid B
4 decembri 2023 g., pirmdiena Autors: AntwerpMetro
|
¤ |
2023
2022
2022
2014
 |
Blancefloerlaan Maršruts 3
30 septembri 2014 g., otrdiena Autors: M. N.
|
¤ |
↑ Augusts 2004 g. Iestāja uz uzņēmumu
Diskusijas par politiku slēdzeni uz 1 mēnesi
Tu ne ienāci vietni. Komentārus var atstāt tikai reģistrēti lietotāji.
Ritošā sastāva saraksti:
|