东四十条桥Behind is the construction site for Beijing Subway Line 3, phase 1.
作者:
jiachen ·
悉尼 日期:
22 六月 2024 年, 星期六
照片数据
照片用途: BY-SA
发布 04.07.2024 06:50 UTC
观看 — 130
详细信息
评分: +4
照片链接
|
Make/Manufacturer: | NIKON CORPORATION |
Model: | NIKON D7200 |
Software or Firmware: | NIKON D7200 Ver.1.04 |
Date and Time: | 22.06.2024 20:05 |
Exposure Time: | 1/400 sec |
Aperture Value: | 5.6 |
ISO Speed: | 140 |
Focal Length: | 65 mm |
Equivalent Focal Length: | 97 mm |
Flash: | Flash did not fire, compulsory flash suppression mode |
Metering Mode: | Center Weighted Average |
Shooting Mode: | Manual |
展示完整EXIF |
|