Map of the Sistema Automático de Transporte Urbano de Oeiras (SATU Oeiras) with all four stages.
First stage was built between 2002 and 2004. It was in use between 2004 and 2015.
Second stage was supposed to be built in 2005, but was quickly cancelled.
Third and fourth stages never got beyond planning.