Transphoto市区电力交通网

历史/新闻纪录: 米蘭

返回至当前城市页面

添加新闻  ·  搜索新闻

««12»»

15 一月 2025 年

The first vehicle of new Stadler Tramlink series has finally begun test service from Deposito ATM Precotto, following a 3 year wait for approval by ANSFISA, Italy's transportation safety bureau. The tran has started regular service on February 20th, 2025.

12 十月 2024 年

Линия метро M4 продлена от San Babila до San Cristoforo.

4 七月 2023 年

The M4 line of the Metropolitana di Milano has been extended from Dateo to San Babila, along with one intermediate station Tricolore. Thus, the line is now connected to the rest of the metro network: San Babila station provides possibility to change for the line M1.

26 十一月 2022 年

The new metro line М4Linate Aeroporto — Dateo is opened.
The first 5.3 km-long segment of the line includes 6 stations: Linate Aeroporto, Repetti, Stazione Forlanini, Argonne, Susa and Dateo. The new line will not be connected to the rest of the metro system until the future Dateo — San Babila segment is built.

1 十月 2022 年

Закрывается трамвайный междугородный маршрут 179 (Milano — Limbiate). Основная причина закрытия — проведение КП сильно изношенной инфраструктуры, с последующим отстранением от регулярных пассажирских перевозок устарелых вагонов серии Bloccati 500. Планируется в будущем конвертировать линию под метро-трам, используя в качестве ПС новые трамваи марки Stadler.

20 十二月 2021 年

Первый день эксплуатации электробуса модели BYD K9UB.

19 十一月 2021 年

Первый день эксплуатации сочленённых троллейбусов на маршруте 93 (Lambrate FS M2 — V.le Omero)

1 五月 2020 年

Первый день регулярной эксплуатации новых троллейбусов Solaris Trollino IV 18.

5 两月 2019 年

Тендер на поставку 80 трамваев (50 городских, 30 пригородных) за 213 млн. евро выиграл Stadler Rail Valencia S.A.
Основные характеристики трамваев: макс. 26 метров длины, низкопольная центральная часть
http://www.ansa.it/lombardia/notizie/201...5e662.html

6 十一月 2018 年

Открыто новое разворотное кольцо "Certosa FS".

8 九月 2018 年

Rozzano's extension Rozzano, via Cabrini — Rozzano, Guido Rossa (1,8 km) is in service now.

2 八月 2018 年

Подтверждено выделение финансов 90 млн. евро на закупку двухсторонних трамваев, 8.84 млн. евро для интерурбана Milano-Limbiate, 180.99 млн. евро для модернизации линии метро М2, 103.55 млн. евро на улучшение линии метро М4, 8.82 млн. евро на выделенную полосу для троллеубуса на участке piazza Cappelli — Tertulliano, 4 млн. евро на выделенную полосу для троллеубуса на участке piazza Pergolesi — Piccinini.
https://cityrailways.com/mit-1700-milioni/34365/

16 七月 2018 年

Подписан контракт на поставку 12 составов "Leonardo". Это позволит к 2020-му году полностью обновить ПС линии М2 (100% "Leonardo" и "Meneghino". Использование только нового ПС позволит снизить минимальный интервал до 90 секунд и снизить средний возраст ПС до 5 лет.

27 三月 2018 年

2 new Solaris Urbino IV 12 Electric started service on route "84". The order includes 25 electric buses, that will be delivered before end of year.

15 三月 2018 年

Solaris won the contract to deliver 80 new Trollino 18,75 MetroStyle trolleybuses with Kiepe Electric equipment. The Esslingen 504 was tested on Milan's Lines 90/91 this February — March.

16 两月 2018 年

The project of the route №7 extension till intersection of streets Adriano and Vipiteno was approved. Budget — 16 millions of euro, project must be concluded in 2021.

20 十一月 2017 年

90-th aniversary of "Ventotto" (milan version of Peter Witt) also called "Carrelli".

11 九月 2017 年

Following rail maintenance the suburban Comasina — Limbiate tramway line reopens for service. The new schedule: Monday — Saturday 5:11-9:54 and 16:28-20:58.
https://www.atm.it/it/ViaggiaConNoi/Info...ntram.aspx

12 六月 2017 年

Suburban tramway line "Comasina"-"Limbiate": service suspended for rail maintenance.

1 六月 2017 年

From 01/06/2017 till 03/09/2017 line 9 runs "Porta Genova" — "Cairoli M1".

1 五月 2017 年

Suburban tramway "Comasina"-"Limbiate" is split in two pieces "Comasina"-"Cassina Amata" and "Cassina Amata"-"Limbiate".

27 四月 2017 年

The tram Line 23 closes. The Line 19 is extended to Lambrate FS in place of the Line 23. The Line 27 is rerouted to Duomo instead of the former terminal Piazza 6 Febbraio. The extended Line 19 now serves the segment between Piazza 6 Febbraio and Duomo in place of the Line 27. The service on the Line 24 is increased by 26 round trips daily. The Lines 15 and 24 exchange terminals — the Line 15 now operates to Via Dogana, while the Line 24 operates to Piazza Fontana.

14 十一月 2015 年

На линии метро M5 открыта новая станция Tre Torri.

11 十月 2015 年

На линии метро M5 открыта новая станция Monumentale.

26 九月 2015 年

На линии метро M5 открыта новая станция Gerusalemme.

20 六月 2015 年

На линии метро M5 открыта новая станция Cenisio.

6 六月 2015 年

На линии метро M5 открыта новая станция Portello.

29 四月 2015 年

Линия метро M5 продлена от Garibaldi FS до San Siro Stadio.

1 十一月 2014 年

1 ноября исполняется 50 миланскому метрополитену

1 三月 2014 年

Линия метро M5 продлена от Zara до Garibaldi FS.

««12»»