![]() |
Cronologie / Știri: ShanghaiÎntoarce-te la pagina orașului Adaugă o înregistrare · Caută în Cronologie / Știri 9 aprilie 2025 anTaiyangdao Buses calls tenders for ten 10 metre class electric buses, with price per vehicle not exceeding ¥1,380,000.
28 martie 2025 anQingpu Buses calls tenders for 10 sub-premium grade 8 metre gelectric buses, 17 sub-premium grade 10.5 metre electric buses and 40 sub-premium grade 9 metre electric buses.
28 martie 2025 anChongming Buses calls tenders for fifty-nine (59) 9 metre sub-premium class electric buses, with price not exceeding ¥1,540,000 per unit and twenty-nine (29) 7 metre sub-premium class electric buses, with price not exceeding ¥1,170,000 per unit.
25 februarie 2025 anLingang Public Transport Group calls tenders for 15x 12 metre dual side door electric buses and 28x 8 metre electric buses.
15 noiembrie 2024 an110 years of the Shanghai trolleybus.
To celebrate the occasion, S5A-0014 has received a special wrap commemorating the start of service in 1914. 20 martie 2024 anTrolleybus overhead wires from Changshu Road Huashan Road to Jingansi are restored; this section is used by route 15 .
3 noiembrie 2023 anTrolleybus route 71区间 (part of Yanan Road Medium Capacity System) extended to Fenghong Road, for a length of 9.6 km with 10 stops.
6 septembrie 2023 anTrolleybus overhead wires in Chongqing Road (S) Depot has been dismantled.
11 iunie 2023 anRoute 23 returns to running on Jinling Road (M) in both directions, after the contact network on this road was restored.
The route now has 100% contact network coverage. 1 iunie 2023 anZhangjiang Tram (Translohr) stops operating, with services replaced by electric buses. The service had a consistently low patronage, a key reason being the centre of the Zhangjiang district shifting away from the area served by the Translohr; the high cost of parts also played a role in its demise.
9 martie 2023 an15 new Yutong dual mode IMF/IMC trolleybuses arrive in Shanghai.
1 februarie 2023 anZhangjiang Tram (Translohr) switches to a fixed schedule from 2023/02/01 due to spare part issues.
The exact services are: from Zhangjiang Metro — 9:00, 9:30, 17:20, 18:00 from Jinqiu Road — 8:00, 8:30, 16:30, 17:00 18 ianuarie 2023 anWith route 15 switching to new Sunwin iEV12T trolleybuses on January 18, YoungMan trolleybuses (JNP6120BEV1 and JNP-WG120G) are fully retired from regular route service.
Ianuarie 2023 an2nd batch of Sunwin SWB5129BEV77G (iEV12T) trolleybuses with 100.27kWh batteries start entering service on routes 14, 19 and 23, replacing the YoungMan JNP6120BEV1 (and its related models)
17 noiembrie 2022 anRoute 8 switches from trolleybuses to electric buses
14 septembrie 2022 anYutong wins a tender for 15 dual-mode IMF/IMC 'medium sized' (12.5 metre) trolleybuses to be used on route 71, at a price of ¥1.4 million (approximately 15.07 million rubles/$207,000USD) each
15 august 2022 anTrolleybus route 25 switches from trolleybuses to electric buses.
Iulie 2022 anWork on route 71 extension has commenced.
31 decembrie 2021 anLine 14 (38 km) and northern extension of Line 18 (21 km) opens.
http://www.news.cn/english/20211230/c732.../c.html 23 ianuarie 2021 anLine 15 is opened apart from Guilin Road, where the transfer is not yet complete.
http://www.shmetro.com/node49/202101/con115512.htm 26 decembrie 2020 anLine 18 (phase 1) and Line 10 extension to the north-east opens
http://www.shmetro.com/node49/202012/con115506.htm 10 august 2019 anОткрыты новые участки Songjiang tram общей длиной 12,9 км:
Маршрут Т1 продлён до Xinmiaosan Road; Маршрут Т2 продлён от Zhongchen Road до North Sanxin Road и становится кольцевым. После открытия этих участков длина сети Songjiang tram составляет 26,8 км. 2 ianuarie 2019 anОткрыт первый участок новой трамвайной сети Songjiang tram. Длина линии между конечными остановками Zhongchen Road на востоке и Canghua Road на западе составляет 13,9 км. Всего на линии 20 остановок.
31 martie 2018 anВведена первая в Китае автоматическая (роботизированная) линия рельсового транспорта Пуцзян протяжённостью 6,69 км. В техническом отношении линия представляет собой LRT на шинном ходу.
30 decembrie 2017 anПротяжённость сети метрополитена превысила 600 км (составила на эту дату 614,1 км).
23 februarie 2017 anЗапущено движение по линии троллейбусного маршрута BRT (маршрут №71) протяжённостью 17,5 км.
Всего в эксплуатации в Шанхае находится (вместе с рядом восстановленных и BRT) 13 троллейбусных маршрутов общей протяжённостью 146,8 км. Действуют маршруты №№:6,8,13,14,15,19,20,22,23,24,25,28 и 71 (BRT). 15 noiembrie 2014 an100th anniversary of trolleybuses in Shanghai. It is the world's longest operating trolleybus system.
16 martie 2014 anВ преддверии 100 летнего юбилея троллейбусного движения принято решение не закрывать троллейбусную сеть.
Заказаны 300 новых троллейбусов Youngman Neoplan JNP6120BEV1, первая партия из 60 троллейбусов прибыла в город в марте, остальные- до конца года. Вместе с этим списаны все старые троллейбусы, а также закрыт троллейбусный маршрут №13, после чего осталось 10 троллейбусных маршрутов в эксплуатации. 29 decembrie 2013 anПротяжённость сети метрополитена превысила 500 км (составила на эту дату 529,3 км).
2013 anТроллейбусная сеть Шанхая оказалась под угрозой закрытия из-за развернувшихся по всему городу строительных работ, возведению развязок и прокладке новых линий метрополитена.
С 1994 г. по 2013 г. из 20 маршрутов последовательно закрыты 9: №№9, 12, 16, 18 и 27. Позднее, в 2000 — х годах: №№ 17 и 21, а к 2008 г.: №№11 и 26. В 2013 г. Шанхайский троллейбус входит с 11 маршрутами, которые обслуживает парк примерно из 150-ти последних троллейбусов. |
Pagina de start Forumuri Regulament Echipa editorială Temă întunecoasă © Administrația Transphoto și autorii fotografiilor, 2002—2025
Utilizarea fotografiilor sau a altor materiale de pe acest site fără acordul autorilor este interzisă. |