Izmit
İzmit
Komentarai: visi · tramvajus
Chronologija
17.06.2017 |
The tramway operation in the city begins. The new 7,4 km-long line between Sekapark in the west and Otogar (the Bus Station) in the east with 11 stations opens. The depot is located near the Otogar Terminal. Travel time via the entire line is 24 min. The line is operated with 12 Durmazlar Panorama trams built in the city of Bursa. |
| Visos chronologijos peržiūra |
Nuotraukų paieška pagal maršrutą
Tramvajų įmonės
Maps
City Photo Galleries
Naujos nuotraukos
» Miscellaneous photos» Tramway Lines and Infrastructure» Tramvajus — 4101, 4103, 4105, 4108.
» Tramway Lines and Infrastructure» Tramvajus — 4102.
Visi atnaujinimai
Informacija
Открытие трамвая в 2017 г.
Tramway to open in 2017.
|
|
Atsitiktinė nuotrauka

    
|
|