TransPhotoElektrinis miestų viešasis transportas
Venesuela  
Lara

Barquisimeto

Pranešti apie klaidą puslapyje  ·  Pasikeitimai duomenų bazėje

Komentarai: visi · troleibusas

Greita TP paieška

Numeris:

Nuotraukų paieška pagal maršrutą

Maršrutas:

Troleibusų įmonės


City Photo Galleries


Naujos nuotraukos

Visi atnaujinimai

Informacija

The 22 km-long single trolleybus BRT line was under construction since 2006. It is known that 80 articulated Neoplan trolleybuses (or rather duobuses) were purchased at about the same time since Venezuela was flush with oil money at the time. The test segment between 3 stops was opened and operated in a full trolleybus mode as intended between 23/11/2012 — 6/2/2013. However, the line operated for a few hours a day only as a demonstration segment. The project, however, was poorly managed, as it was plagued with cost overruns, and thus was canceled. Or, at least, the trolleybus element of it was canceled. Neoplan duobuses were then used in a diesel mode only.

Aktyvūs miesto fotografai

1-a vieta: D.Möschke — 1 foto

Visas fotografų sąrašas

   

Atsitiktinė nuotrauka

14


Naujos nuotraukos

3
17
14